Compact Flotation Unit — 15,000 BPD
Project Overview
Full engineering, procurement, and commissioning management for a fast-track 15,000 BPD two-stage compact flotation unit treating produced water for Mubadala Petroleum, designed for an oil-in-water discharge specification consistently below 30 ppm.
Technical Scope
- Capacity
- 15,000 BPD
- Configuration
- Two-stage CFU
- OIW spec
- <30 ppm
- OIW achieved
- <15 ppm during PT
- Year
- 2018
- Client
- Mubadala Petroleum
- Lifecycle
- IFQ → IFC → commissioned
Engineering Approach
Multi-discipline detailed engineering was led from IFQ through IFC — producing P&IDs, hydraulic calculations, instrument datasheets, cause-and-effect matrices, and the commissioning procedure.
The fabrication contract was managed end-to-end including technical bid evaluation, weekly vendor progress reviews, and factory acceptance testing.
Offshore commissioning supervision was provided through to first-water and sustained compliance with the discharge permit, with the FEEC commissioning lead resident on the platform during start-up.
Have a similar scope? Tell us your project and we'll respond within one business day.
Discuss your projectProject Outcomes
- Commissioned on schedule and within budget
- Discharge quality consistently <15 ppm OIW during performance testing
- Sustained operational compliance with the regulatory discharge permit