Onshore Production Facility — FEED, New Zealand
Project Overview
FEED package for a modular production facility to be installed onshore New Zealand, designed to debottleneck the operator's existing central processing facility and accommodate ongoing field development.
Technical Scope
- Construction
- Modular skid-mounted
- Cost class
- Class 2 (FEED)
- Year
- 2024
- Region
- Onshore New Zealand
- Driver
- Debottleneck existing CPF
- Client
- Confidential
Engineering Approach
FEEC led surface-facilities engineering for the FEED, developing the basis of design, validated process simulation, full PFD and P&ID set, heat and material balances, and equipment datasheets for static and rotating equipment.
The deliverables were structured around a modular execution philosophy to minimise on-site construction time and integrate cleanly with the existing CPF, with main project specifications and RFQs prepared for long-lead-item procurement.
A Class 2 cost and schedule were developed in parallel, giving the operator the substantiating engineering and commercial basis to progress to detailed design.
Have a similar scope? Tell us your project and we'll respond within one business day.
Discuss your projectProject Outcomes
- FEED package accepted for progression to detailed design
- Class 2 cost estimate met the operator's investment-decision tolerance
- RFQs and vendor bid evaluations completed within the FEED window
Services Delivered
Related Reading