Well Abandonment with Novel Bismuth Plug Technology
Project Overview
Engineering drawings and operating procedures for a well abandonment programme using novel bismuth plug technology — providing a tested, regulator-compliant alternative to traditional cement-based plug and abandonment.
Technical Scope
- Scope
- Drawings + procedures
- Year
- 2024
- Technology
- Bismuth alloy plug
- Application
- Permanent P&A
- Standards
- P&A regulatory framework
- Client
- Revive Well X
Engineering Approach
FEEC prepared the full engineering drawings package and step-by-step operating procedures for deployment of the bismuth plug, working from the technology vendor's product specifications and the operator's well configuration.
The procedures covered surface equipment line-up, deployment sequence, contingency operations, and post-set verification — together with the supporting risk and operability assessments.
Drawings and procedures were structured for both regulatory submission and field-execution use, with clear interfaces between rig contractor, plug supplier, and operator scope.
Have a similar scope? Tell us your project and we'll respond within one business day.
Discuss your projectProject Outcomes
- Engineering package accepted by client for field deployment
- Procedures supported a successful well abandonment campaign
- Documentation contributed to the regulatory acceptance basis for the novel plug