Well Abandonment with Novel Bismuth Plug Technology

Detailed EngineeringProcess Safety

Project Overview

Engineering drawings and operating procedures for a well abandonment programme using novel bismuth plug technology — providing a tested, regulator-compliant alternative to traditional cement-based plug and abandonment.

Technical Scope

Scope
Drawings + procedures
Year
2024
Technology
Bismuth alloy plug
Application
Permanent P&A
Standards
P&A regulatory framework
Client
Revive Well X

Engineering Approach

FEEC prepared the full engineering drawings package and step-by-step operating procedures for deployment of the bismuth plug, working from the technology vendor's product specifications and the operator's well configuration.

The procedures covered surface equipment line-up, deployment sequence, contingency operations, and post-set verification — together with the supporting risk and operability assessments.

Drawings and procedures were structured for both regulatory submission and field-execution use, with clear interfaces between rig contractor, plug supplier, and operator scope.

Have a similar scope? Tell us your project and we'll respond within one business day.

Discuss your project

Project Outcomes

  • Engineering package accepted by client for field deployment
  • Procedures supported a successful well abandonment campaign
  • Documentation contributed to the regulatory acceptance basis for the novel plug

Services Delivered

Detailed EngineeringProcess Safety