Project Overview

Detailed engineering and full project management for a modular skid-mounted gas processing facility for Hindustan Oil Exploration Company in Assam, designed for 35 MMscfd of wellhead gas across the complete processing train.

Technical Scope

Capacity
35 MMscfd
Region
Assam, India
Year
2016
Client
HOEC
Construction
Modular, skid-mounted
Schedule benefit
~6 weeks vs stick-built

Engineering Approach

Multi-discipline detailed engineering was led through all issue stages, covering inlet slug catching, two-stage compression, aerial cooling, TEG dehydration to pipeline specification, condensate stabilisation, and fiscal custody metering to national pipeline standards.

Procurement of long-lead items — including compressor packages and dehydration columns — was managed by FEEC with structured technical bid evaluation and weekly progress monitoring.

Full-time field supervision was provided throughout installation, pre-commissioning, and commissioning, with the operational facility handed over to the HOEC production team ahead of the contractual first-gas milestone.

Have a similar scope? Tell us your project and we'll respond within one business day.

Discuss your project

Project Outcomes

  • First-gas milestone achieved ahead of contractual date
  • Modular approach saved approximately six weeks of remote-site construction time
  • Direct handover from FEEC to HOEC production team — no contractor middleman