HP Separator Blowdown — Dynamic Simulation

Detailed EngineeringProcess SimulationProcess Safety

Project Overview

Dynamic process simulation of a high-pressure production separator blowdown system, assessing depressurisation from 120 bara to 50% MAWP within the 15-minute target required by the project ESD philosophy.

Technical Scope

Initial pressure
120 bara
Target
50% MAWP within 15 min
Standards
API 521
Tools
Dynamic process simulation
Client
APSL Systems Limited

Engineering Approach

Blowdown valve Cv was validated against API 521 requirements, with minimum vessel wall temperatures during depressurisation confirmed above the material impact test temperature for the specified grade of carbon steel.

The time-varying flare load profile was assessed to confirm adequacy of the existing flare stack capacity under the blowdown scenario, with backup hand calculations supporting each result.

Have a similar scope? Tell us your project and we'll respond within one business day.

Discuss your project

Project Outcomes

  • Reviewed and accepted by the project's independent safety assessor
  • Results incorporated into the formal safety case without modifications
  • No design changes required — blowdown system confirmed compliant

Services Delivered

Detailed EngineeringProcess SimulationProcess Safety