Offshore Topside Module — Basic Engineering & Cost Estimation
Project Overview
Basic engineering and Class 5 cost estimation for an offshore topside module, supporting the contractor's tender for a fast-track package supply campaign.
Technical Scope
- Cost class
- Class 5
- Year
- 2024
- Scope
- Basic engineering
- Application
- Topside module
- Delivery
- Fast-track tender support
- Client
- Expro
Engineering Approach
Working to the contractor's fast-track tender clock, FEEC set the process design basis for the topside module and ran the supporting steady-state simulation to fix the heat and material balance and the duties of the major equipment.
From the simulation FEEC sized and listed the principal equipment, defined the technical scope of supply, and prepared the equipment RFQs the contractor needed to price the package.
A Class 5 capital cost estimate was built on top of that equipment basis, giving the contractor a single coherent technical and commercial story to put into the bid.
Have a similar scope? Tell us your project and we'll respond within one business day.
Discuss your projectProject Outcomes
- Full basic-engineering and RFQ pack handed over inside the contractor's tight tender clock
- Defined technical scope let the contractor table a credible, fully-costed module offer
- Class 5 cost-to-build slotted directly into the contractor's bid pricing
Services Delivered