Front End Engineering
Consultancy
Lift PumpDM FilterCl₂DeaeratorVac.O₂ Scav.HP PumpsInj.
All projectsOffshore · Injection

100,000 BPD Seawater Injection Topside — Gulf of Mexico

Conceptual EngineeringProcess SimulationCost Estimation

Project Overview

Basic engineering and Class 5 cost estimation for the supply of a 100,000 BPD seawater injection topside for deployment in the Gulf of Mexico, covering the complete treatment and injection train.

Technical Scope

Capacity
100,000 BPD
Region
Gulf of Mexico
Year
2023
Cost class
Class 5
Treatment
Vacuum deaeration
Client
Trendsetter

Engineering Approach

FEEC delivered the process design basis, sizing the complete water treatment chain — coarse and fine filtration, deaerator tower with vacuum package, seawater lift pumps, and high-pressure injection pumps — together with supporting hydraulic, instrumentation, and electrical scope.

A complete set of PFDs, P&IDs, equipment datasheets, equipment list and layout, project specifications, and equipment RFQs were issued, with cost-to-build prepared for tender.

A Class 5 capital cost estimate was structured to give the client an early-stage basis for decision support and investor presentation.

Have a similar scope? Tell us your project and we'll respond within one business day.

Discuss your project

Project Outcomes

  • Basic engineering package issued within tender deadline
  • Class 5 cost estimate provided basis for client's commercial proposal
  • Vendor bid evaluations completed and supplier selected

Services Delivered

Conceptual EngineeringProcess SimulationCost Estimation